This Old House - Ipswich New Life

A granite veneer water table is installed. The old roof boards are installed on the ceiling of the new ell. A dry laid stone wall is built. The plumbing manifold is discussed. A carpenter talks about leaving corporate and returning to the trades.

Series Website: http://www.thisoldhouse.com/toh/

Recent and Upcoming Airings

11.1 5/25 7:00 pm 11.3 5/26 2:00 am 11.1 5/27 9:30 am 11.1 5/28 3:30 am 11.3 6/9 2:00 am 11.1 6/10 4:00 am 11.1 6/10 9:30 am