Episode Information

This Old House - Lexington Install with Care

Work begins on the internal geothermal systems. In-wall lighting is installed to illuminate the entrance ramp. An offset p-trap is installed for accessibility. A glass blowing studio is visited. Back at the house, grab bar installation begins.

Series Website: http://www.thisoldhouse.com/toh/

Recent and Upcoming Airings

11.18/29 7:00 pm 11.38/30 2:00 am 11.18/31 4:00 am